ABCD: A Better Cabinet Design
ยท 10 min read
The earlier the cabinet conversation starts, the more you can plan ahead and the fewer surprises you'll hit. A planning guide with real numbers, a one-page checklist, and the choices that save thousands per operatory.
At BIEL, we have built cabinets for more than 1,000 practices. In our experience, the most expensive surprises in a build-out come from a short list of decisions that nobody tells you to make early: which rooms share a sink, where the power and data run, how the sterilization area is laid out, and how many rooms you plumb today for the practice you'll have in five years.
This guide walks through those decisions in the order you'll face them, with the math for a 10-operatory office so you can see what each choice is worth. It's written for dentists building a first office and for established practices opening a second location or expanding.
What's inside
- Plan early: lead times, equipment types to know going in, and how direct pricing works
- The operatory: shared sinks, the built-in wire chase, and the choices that repeat in every room
- Sterilization: why a galley beats an L or U, with the cost of dead corners worked out
- Planning for your full office and choosing finishes
- What to check during construction and install
- A one-page checklist with an owner and a date for every item
Plan early
Cabinets are built to order for your rooms, so the earlier the conversation starts, the better. Plan on 12 weeks minimum from the first call to delivery, however we really would prefer six months or more if you can so the design is never rushed.
Know your equipment types coming into the meeting. You don't need model numbers yet, but you do need to know whether you will have a sterilizer, an ultrasonic or a Hydrim, rear or chair delivery, and installed nitrous or carts.