Planning for 5 Ops When You Open With 3

ยท 3 min read

Opening with three operatories in a space built for five? Put cabinets in every room, rough in utilities now, and add dental equipment as the practice grows.

Many practices open with fewer working operatories than the space will eventually hold. The floor plan has room for five, but the budget and the patient base support equipping three on day one. That is a smart way to grow, and with a little planning up front, the rooms you bring online later can come together quickly and cleanly instead of turning into a second construction project.

Cabinets in every room, equipment as you grow

Where the budget allows, we recommend putting cabinets in all five operatories during the build and adding chairs, delivery units and other dental equipment to the extra rooms as your schedule fills. Every room looks finished on opening day, and the work that touches walls, floors and utilities is done while the contractor is still on site. When it is time to bring a room online, you are adding equipment to a room that is already built for it.

Rough in every room during construction

The least expensive time to run utilities to a future operatory is while the walls are already open for the rest of the build. Coming back later means opening finished walls and floors, working around a practice that is seeing patients, and paying retrofit prices for all of it.

For each future room, plan with your contractor to rough in plumbing, power and data to the spot where the console will sit, the same way you would for a room you are equipping now. If you use nitrous often, plan for installed nitrous early in the process. Adding nitrous later is possible, but it's typically more difficult and permitting can change, so check with a licensed med gas plumber for what's possible in your area.

If the budget means waiting, plan two shipments

Sometimes cabinets for every room are not in the budget on day one, and that is fine. The cabinets can come in two phases: the first shipment goes in with the build, and when you are ready for the rest, the second shipment can be installed by a local installer in your area.

What we steer people away from is adding a cabinet or two every few months. Every shipment carries its own base freight cost, so small orders mean paying to ship again each time. Grouping the remaining rooms into one second shipment keeps freight down.

Choose consoles that grow with you

Technology in the operatory changes faster than cabinetry does. The Power Wall routes power and data through a back panel with a built-in wire chase, so there is no need to run additional electrical and data conduit to each console. That saves cost during the build and again later, when cables need to be changed or added. When your future rooms come online, using the same console line and finishes keeps the whole office looking like it was built at once.

Plan the whole office once

Whether you are opening a first office or expanding an established practice, the best time to plan every operatory is at the start. Several of the groups we work with begin planning their next project as soon as one finishes, because they have seen how much easier it is when the full plan exists from day one.

Plan on 12 weeks or more from first call to delivery. Simple projects can be done in as little as 8.

Planning a build in phases? Our free white paper, ABCD: A Better Cabinet Design, walks through how to plan your rooms for the practice you will have in five years, not just the one you open with. Download the white paper, try our cost estimator, or book a meeting.